Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/21/2026 at 7:55pm; Resumed Operation on 9/21/2026 by 8:28pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/21/2026 at 7:55pm; Resumed Operation on 9/21/2026 by 8:28pm On Monday, September 21 2026, Chiquita experienced unplanned downtime of Flare 2 beginning at approximately 7:55pm due to flame failure. Flare 2 resumed operation at approximately 8:28pm. Due to this downtime, there was a possibility…
