Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/7/2026 at 4:01 pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/7/2026 at 4:01 pm As previously noticed, on Monday, 7/6/2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 8:50 pm due to ongoing troubleshooting. Flare 3 resumed operations by 7/7/2026 at approximately 4:01 pm. Under Condition 81 of the Modified Stipulated Order for…
