Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 4/19/2025 at 7:18pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 4/19/2025 at 7:18pm On Saturday, April 19, 2025, Chiquita experienced unplanned downtime of Flares 1, 2, and 3, starting at 7:18pm with an anticipated duration of approximately 102 minutes. The reason for the shutdown is still being determined. Due to this downtime, there may…
