Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/22/2026 at 1:48pm; Resumed Operation on 8/23/2026 by 6:25am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/22/2026 at 1:48pm; Resumed Operation on 8/23/2026 by 6:25am On Saturday, August 22, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 1:48pm due to flame failure. The Parnel TOx resumed operation on August 23, 2026, at approximately 6:25am. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/21/2026 at 7:50pm; Resumed Operation on 8/22/2026 by 8:24am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/21/2026 at 7:50pm; Resumed Operation on 8/22/2026 by 8:24am On Friday, August 21, 2026, Chiquita experienced unplanned downtime of the Zeeco TOx 7 at approximately 7:50pm due to flame failure. The Zeeco TOx 7 resumed operation on August 22, 2026, at approximately 8:24am. The…

Read article