Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/22/2026 by 7:30am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/22/2026 by 7:30am As previously noticed, on Monday, September 21, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 2:13pm due to flame failure. The Parnel TOx resumed operations by September 22, 2026, at approximately 7:30am. Under Condition 81 of the Modified…
