Alert: Landfill Gas Collection and Control Equipment Unplanned Planned Down Time on 12/06/2024 at 4:09am
Alert: Landfill Gas Collection and Control Equipment Unplanned Planned Down Time on 12/06/2024 at 4:09am On Friday, December 6, 2024, Chiquita experienced unplanned downtime of the Zeeco thermal oxidizer due to a flame failure. The Zeeco thermal oxidizer was down for approximately 16 minutes, which is less than 30 minutes, but we nevertheless provided a…
