Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/3/2026 at 9:47 am; Resumed Operation on 7/3/2026 by 10:32 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/3/2026 at 9:47 am; Resumed Operation on 7/3/2026 by 10:32 am On Friday, July 3, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 9:47 am due to a high level of liquid in the knockout pot. Flare 2 resumed operation at approximately…
