Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/28/2026 by 1:14 pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/28/2026 by 1:14 pm As previously noticed, on Monday, September 28, 2026, Chiquita experienced an unplanned downtime of Flare 2 due to flame failure. During the unplanned downtime, Chiquita repaired the burner thermocouples in Flare 2. Flare 2 resumed operation by September 28, 2026,…
