Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/8/2026 by 6:20am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/8/2026 by 6:20am As previously noticed, on Sunday, November 8, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 4:11am and 4:12am, respectively, due to flame failure and high flow, respectively. Flares 2 and 3 resumed operation by November 8, 2026,…
