Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/19/2026 at 2:49 am; Resumed Operation on 6/19/2026 by 5:59 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/19/2026 at 2:49 am; Resumed Operation on 6/19/2026 by 5:59 am On Friday, June 19, 2026, Chiquita experienced unplanned downtime of Flares 1, 2, and 3, the Hero TOx, and the Zeeco TOx at 2:49 am due to a sitewide power shutdown. Field technicians…
