Published - January 10, 2025 @ 10:17 AM
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 1/10/2025 at 5:35am
On Friday, January 10, 2025, Chiquita experienced unplanned downtime of Flares 1, 2, and 3 and the Zeeco thermal oxidizer upon restoration of power after completion of Southern California Edison’s Public Safety Power Shutoff (PSPS) event. Flare 3 successfully restarted in accordance with its program. The remaining equipment will be restarted upon completion of system inspections. Due to this downtime, there is a possibility of increased odors in the community during the indicated time period.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community (i) if any individual control device has downtime which is anticipated to last 30 minutes or more or once any downtime for an individual control device reaches 30 minutes of downtime or (ii) if the downtime of any combination of landfill gas collection equipment results or is planned to result in a reduction of gas flow to control devices by 10% or more and the downtime is anticipated to last 30 minutes or more or once any downtime for such devices reach 30 minutes of downtime.
Chiquita continues to work to diligently comply with regulator orders.