Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/15/2026 at 12:26pm
On Sunday, November 15, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 12:26pm due to flame failure. Flare 2 initially resumed operation at approximately 1:24pm, but shut down again at 11:40pm and was restarted on November 16, 2026, at 12:16am. Flare 2 experienced additional downtime at approximately 2:26am due to flame failure, resumed operation at 6:08am, and shut down again at 6:31am. This latest downtime is anticipated to last for up to 2 hours and 29 minutes. Due to this downtime, there may be a possibility of increased odors in the community during the indicated time period.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community when an individual control device is down for at least 30 minutes or is expected to be, or when downtime of landfill gas collection equipment results or is expected to result in a reduction of gas flow to control devices by 10% or more for at least 30 minutes. Condition 81 also requires notification when the affected gas collection and control equipment resumes operation.
Chiquita continues to work to diligently comply with regulator orders.