Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/18/2026 at 9:00pm; Resumed Operation on 9/19/2026 by 7:53am
On Friday, September 18, 2026, Chiquita experienced unplanned downtime of Flare 2 beginning at approximately 9:00p due to flame failure. Flare 2 resumed operation at approximately 11:12pm. On September 19, Flare 2 experienced two additional unplanned downtimes due to flame failure, from approximately 1:31am to 2:23am and from approximately 4:06am to 7:53am. The downtime events lasted approximately 2 hours and 12 minutes, 52 minutes, and 3 hours and 47 minutes, respectively. Due to these downtimes, there was a possibility of increased odors in the community during the indicated time period.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community (i) if any individual control device has downtime which is anticipated to last 30 minutes or more or once any downtime for an individual control device reaches 30 minutes of downtime or (ii) if the downtime of any combination of landfill gas collection equipment results or is planned to result in a reduction of gas flow to control devices by 10% or more and the downtime is anticipated to last 30 minutes or more or once any downtime for such devices reach 30 minutes of downtime. Pursuant to Condition 81, Chiquita is also required to notify the community once the gas collection and control equipment has resumed operation.
Chiquita continues to work to diligently comply with regulator orders.