Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/21/2026 at 1:06pm
On Saturday, November 21, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 1:06pm due to high temperature, and Flares 2 and 3 at approximately 2:42pm and 2:41pm due to flame failure and high flow, respectively. The downtime of the Parnel TOx is anticipated to last for up to 4 hours and 24 minutes, of Flare 2 up to 1 hour and 18 minutes, and of Flare 3 up to 1 hour and 19 minutes. Due to this downtime, there may be a possibility of increased odors in the community during the indicated time period.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community when an individual control device is down for at least 30 minutes or is expected to be, or when downtime of landfill gas collection equipment results or is expected to result in a reduction of gas flow to control devices by 10% or more for at least 30 minutes. Condition 81 also requires notification when the affected gas collection and control equipment resumes operation.
Chiquita continues to work to diligently comply with regulator orders.