Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/3/2026 at 11:56 pm; Resumed Operation on 8/4/2026 by 4:46 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/3/2026 at 11:56 pm; Resumed Operation on 8/4/2026 by 4:46 am On Monday, August 3, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 11:56 pm due to pilot failure. Flare 2 resumed operation on August 4, 2026, at approximately 4:46 am. The…

Read article