Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm On Saturday, July 18, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:47 am due to flame failure. The Parnel TOx resumed operation at approximately 2:41 pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm On Friday, July 17, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 7:10 pm due to block valve malfunction. Flare 3 resumed operation at approximately 10:01 pm. The downtime of Flare…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/14/2026 at 3:53 am; Resumed Operation on 7/14/2026 by 5:19 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/14/2026 at 3:53 am; Resumed Operation on 7/14/2026 by 5:19 am On Tuesday, July 14, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 3:53 am due to flame failure. Flare 3 resumed operation at approximately 5:19 am. The downtime of Flare 3…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/10/2026 at 11:06 am; Resumed Operation on 7/10/2026 by 2:15 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/10/2026 at 11:06 am; Resumed Operation on 7/10/2026 by 2:15 pm On Friday, July 10, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:06 am due to flame failure. The Parnel TOx resumed operation at approximately 2:15 pm. The downtime of…

Read article