Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 12/14/2025 at 8:28 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 12/14/2025 at 8:28 am On Sunday, December 14, 2025, Chiquita experienced unplanned downtime of Flare 1, 2, and 3, and the Zeeco Tox at 8:28 am due to utility pole replacement being performed by Southern California Edison adjacent to the facility. This downtime is…
