Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm On Saturday, July 18, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:47 am due to flame failure. The Parnel TOx resumed operation at approximately 2:41 pm. The downtime of…
