Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/15/2026 by 6:40pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/15/2026 by 6:40pm As previously noticed, on Thursday, October 15, 2026, Chiquita experienced unplanned downtime of Flares 1 and 2 at approximately 1:13pm due to a power shutdown. Flares 1 and 2 resumed operation by October 15, 2026, at approximately 6:40pm. Under Condition 81…
