Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/14/2026 at 3:53 am; Resumed Operation on 7/14/2026 by 5:19 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/14/2026 at 3:53 am; Resumed Operation on 7/14/2026 by 5:19 am On Tuesday, July 14, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 3:53 am due to flame failure. Flare 3 resumed operation at approximately 5:19 am. The downtime of Flare 3…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/10/2026 at 11:06 am; Resumed Operation on 7/10/2026 by 2:15 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/10/2026 at 11:06 am; Resumed Operation on 7/10/2026 by 2:15 pm On Friday, July 10, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:06 am due to flame failure. The Parnel TOx resumed operation at approximately 2:15 pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/9/2026 at 7:40 pm; Resumed Operation on 7/10/2026 by 7:00 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/9/2026 at 7:40 pm; Resumed Operation on 7/10/2026 by 7:00 am On Thursday, July 9, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 7:40 pm due to flame failure. Flare 3 was restarted at 9:30 pm, but then experienced another downtime event…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/5/2026 at 10:39 pm; Resumed Operation on 7/5/2026 by 11:54 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/5/2026 at 10:39 pm; Resumed Operation on 7/5/2026 by 11:54 pm On Sunday, July 5, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 10:39 pm due to ongoing system rebalancing. Flare 3 resumed operation on 7/5/2026 at approximately 11:21 pm. The Parnel…

Read article