Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/3/2026 at 3:39 pm; Resumed Operation on 8/3/2026 by 4:29 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/3/2026 at 3:39 pm; Resumed Operation on 8/3/2026 by 4:29 pm On Monday, August 3, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 3:39 pm due to backed up liquids in the header. The Parnel TOx resumed operation at approximately 4:29…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/22/2026 at 7:56 pm; Resumed Operation on 7/23/2026 by 4:57 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/22/2026 at 7:56 pm; Resumed Operation on 7/23/2026 by 4:57 am On Wednesday, July 22, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 7:56 pm due to flame failure. Flare 3 was restarted at 9:46 pm, but then experienced another downtime at…

Read article