Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/10/2026 by 1:50pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/10/2026 by 1:50pm As previously noticed, on Wednesday, September 9, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 3:03pm due to flame failure. The Parnel TOx resumed operations by September 10, 2026, at 1:50pm. Under Condition 81 of the Modified Stipulated…
