Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/9/2026 by 9:50am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/9/2026 by 9:50am As previously noticed, on Sunday, November 8, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 9:20pm due to flame failure. Flare 2 resumed operation by November 9, 2026, at approximately 9:50am. Under Condition 81 of the Modified Stipulated Order…
