Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/5/2026 at 2:31am; Resumed Operation on 11/5/2026 by 5:58am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/5/2026 at 2:31am; Resumed Operation on 11/5/2026 by 5:58am On Thursday, November 5, 2026, Chiquita experienced unplanned downtime of the Zeeco 2 TOx at approximately 2:31am due to the blower tripping. The Zeeco 2 TOx resumed operation on November 5, 2026, at approximately 5:58am.…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 3:40pm; Resumed Operation on 11/1/2026 by 9:40pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 3:40pm; Resumed Operation on 11/1/2026 by 9:40pm On Sunday, November 1, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 3:39pm due to flame failure and high flow, respectively. Flare 2 and Flare 3 resumed operation at approximately 4:32pm…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 6:30am; Resumed Operation on 11/1/2026 by 7:59am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 6:30am; Resumed Operation on 11/1/2026 by 7:59am On Sunday, November 1, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 6:30am due to flame failure and high flow, respectively. Flare 2 resumed operation on November 1, 2026 at approximately…

Read article