Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/19/2026 at 6:38am; Resumed Operation on 11/19/2026 by 7:43am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/19/2026 at 6:38am; Resumed Operation on 11/19/2026 by 7:43am On Thursday, November 19, 2026, Chiquita experienced unplanned downtime of the Zeeco #2 TOx at approximately 6:38am due to flame failure. The Zeeco #2 TOx resumed operation on November 19, 2026, at approximately 7:43am. Under…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/9/2026 at 12:09pm; Resumed Operation on 11/9/2026 by 12:50pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/9/2026 at 12:09pm; Resumed Operation on 11/9/2026 by 12:50pm On Monday, November 9, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 12:09pm due to blower failure. The Parnel TOx resumed operation on November 9, 2026, at approximately 12:50pm. Under Condition 81…

Read article