Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/2/2026 by 8:15am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/2/2026 by 8:15am As previously noticed, on Wednesday, September 2, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 2:53am due to flame failure. Flare 2 resumed operations by September 2, 2026, at 8:15am. Under Condition 81 of the Modified Stipulated Order for…
