Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/8/2026 at 9:20pm; Resumed Operation on 11/8/2026 by 10:06pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/8/2026 at 9:20pm; Resumed Operation on 11/8/2026 by 10:06pm On Sunday, November 8, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 9:20pm due to flame failure and high flow, respectively. Flare 3 resumed operation on November 8, 2026, at approximately…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/5/2026 at 2:31am; Resumed Operation on 11/5/2026 by 5:58am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/5/2026 at 2:31am; Resumed Operation on 11/5/2026 by 5:58am On Thursday, November 5, 2026, Chiquita experienced unplanned downtime of the Zeeco 2 TOx at approximately 2:31am due to the blower tripping. The Zeeco 2 TOx resumed operation on November 5, 2026, at approximately 5:58am.…

Read article