Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/20/2026 at 10:00am

Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/20/2026 at 10:00am As previously noticed, on Thursday, August 20, 2026, Chiquita experienced planned downtime of the Hero TOx at approximately 7:00am to performance maintenance on the detonation arrestor. The Hero TOx resumed operations by August 20, 2026, at approximately 10:00am. Under Condition 81…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/16/2026 at 9:15pm; Resumed Operation on 8/16/2026 by 10:11pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/16/2026 at 9:15pm; Resumed Operation on 8/16/2026 by 10:11pm On Sunday, August 16, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 9:15 pm due to flame failure. Flare 3 resumed operation on August 16, 2026, at approximately 10:11 pm. The downtime of…

Read article