Landfill Gas Collection and Control Equipment Unplanned Down Time on 12/13/2025 at 9:54 pm
Landfill Gas Collection and Control Equipment Unplanned Down Time on 12/13/2025 at 9:54 pm On Saturday, December 13, 2025, Chiquita experienced unplanned downtime of Flare 1 at 9:54 pm due to low temperature. This downtime was anticipated to last for up to 126 minutes. Due to this downtime, there may be a possibility of increased…
