Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/25/2026 by 10:30am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/25/2026 by 10:30am As previously noticed, on Saturday, October 24, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 5:16am due to flame failure. Flare 2 resumed operation by Sunday, October 25, 2026, at approximately 10:30am. Under Condition 81 of the Modified Stipulated…
