Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 8:36 pm; Resumed Operation on 8/31/2026 by 10:09 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 8:36 pm; Resumed Operation on 8/31/2026 by 10:09 pm On Monday, August 31, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 8:36 pm due to flame failure. Flare 2 resumed operation on August 31, 2026, at approximately 10:09 pm. The…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 1:25 am; Resumed Operation on 8/31/2026 by 6:09 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 1:25 am; Resumed Operation on 8/31/2026 by 6:09 am On Monday, August 31, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 1:25 am due to flame failure. Flare 2 was restarted at 2:05 am, but then experienced another downtime event…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/30/2026 at 5:55am; Resumed Operation on 8/30/2026 by 6:50am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/30/2026 at 5:55am; Resumed Operation on 8/30/2026 by 6:50am On Sunday, August 30, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 5:55am due to flame failure. Flare 2 resumed operation on August 30, 2026, at approximately 6:50am. The downtime of Flare 2…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am On Saturday, August 29, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 9:26am due to a blower fault. The Parnel TOx resumed operation on August 29, 2026, at approximately 9:57am. The downtime…

Read article