Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 9:07am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 9:07am As previously noticed, on Friday, October 16, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 4:34am due to flame failure. Flare 2 resumed operation by October 16, 2026, at approximately 9:07am. Under Condition 81 of the Modified Stipulated Order…
