Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 12:38pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 12:38pm As previously noticed, on Thursday, October 15, 2026, Chiquita experienced planned downtime of the Zeeco #7 TOx at approximately 7:00am for overhead power line modifications. The Zeeco #7 TOx resumed operation by October 16, 2026, at approximately 12:38pm. Under Condition 81…
