Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/14/2026 at 6:23pm; Resumed Operation on 9/14/2026 by 8:22pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/14/2026 at 6:23pm; Resumed Operation on 9/14/2026 by 8:22pm On Monday, September 14, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 6:23pm due to rapid flow change. Flare 3 resumed operation on September 14, 2026, at approximately 8:22pm. The downtime of Flare…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/13/2026 at 10:37pm; Resumed Operation on 9/14/2026 by 1:51am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/13/2026 at 10:37pm; Resumed Operation on 9/14/2026 by 1:51am On Sunday, September 13, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 10:37pm due to flame failure. Flare 3 was restarted at 11:18pm, but then experienced unplanned downtime on September 14, 2026 by…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/12/2026 at 8:19pm; Resumed Operation on 9/13/2026 by 5:46am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/12/2026 at 8:19pm; Resumed Operation on 9/13/2026 by 5:46am On Saturday, September 12, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 8:19pm due to flame failure. Flare 3 resumed operation on September 13, 2026, at approximately 5:46am. The downtime of Flare 3…

Read article