Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/11/2026 at 3:35am; Resumed Operation on 11/11/2026 by 5:03am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/11/2026 at 3:35am; Resumed Operation on 11/11/2026 by 5:03am On Wednesday, November 11, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 3:35am due to flame failure from low combustion air flow. Flare 2 resumed operation on November 11, 2026, at approximately 5:03am.…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 8:42am; Resumed Operation on 11/3/2026 by 9:24am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 8:42am; Resumed Operation on 11/3/2026 by 9:24am On Tuesday, November 3, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 8:42am due to high flow. Flare 3 resumed operation on November 3, 2026 at approximately 9:24am. Under Condition 81 of the…

Read article