Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/15/2026 by 7:33am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/15/2026 by 7:33am As previously noticed, on Wednesday, October 14, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 3:33pm due to flame failure. The Parnel Tox resumed operation by October 15, 2026, at approximately 7:33am. Under Condition 81 of the Modified…
