Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/15/2026 by 8:02am
As previously noticed, on Thursday, October 15, 2026, Chiquita experienced planned downtime of Zeeco #1 TOx, Zeeco #6 TOx, Zeeco #7 TOx, Parnel TOx, and Hero TOx, at approximately 7:00am for overhead power line modifications. The Hero TOx and Parnel TOx resumed operation by October 15, 2026, at approximately 7:20am and 7:36am, respectively. The Zeeco #1 TOx and Zeeco #6 TOx resumed operation by October 15, 2026, at approximately 8:02am. The Zeeco #7 TOx is still offline.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community (i) if any individual control device has downtime which is anticipated to last 30 minutes or more or once any downtime for an individual control device reaches 30 minutes of downtime or (ii) if the downtime of any combination of landfill gas collection equipment results or is planned to result in a reduction of gas flow to control devices by 10% or more and the downtime is anticipated to last 30 minutes or more or once any downtime for such devices reach 30 minutes of downtime. Pursuant to Condition 81, Chiquita is also required to notify the community once the gas collection and control equipment has resumed operation.
Chiquita continues to work to diligently comply with regulator orders.