Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:41 am; Resumed Operation on 7/27/2026 by 4:50 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:41 am; Resumed Operation on 7/27/2026 by 4:50 am On Monday, July 27, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 3:41 am due to flame failure. Flare 2 resumed operation at approximately 4:50 am. The downtime of Flare 2…
