Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/26/2026 at 9:40am; Resumed Operation on 8/26/2026 by 11:29am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/26/2026 at 9:40am; Resumed Operation on 8/26/2026 by 11:29am On Wednesday, August 26, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 9:40am due to low temperature. The Parnel TOx resumed operation on August 26, 2026, at approximately 11:29am. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/21/2026 at 7:50pm; Resumed Operation on 8/22/2026 by 8:24am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/21/2026 at 7:50pm; Resumed Operation on 8/22/2026 by 8:24am On Friday, August 21, 2026, Chiquita experienced unplanned downtime of the Zeeco TOx 7 at approximately 7:50pm due to flame failure. The Zeeco TOx 7 resumed operation on August 22, 2026, at approximately 8:24am. The…

Read article