Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/18/2026 at 9:00pm; Resumed Operation on 9/19/2026 by 7:53am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/18/2026 at 9:00pm; Resumed Operation on 9/19/2026 by 7:53am On Friday, September 18, 2026, Chiquita experienced unplanned downtime of Flare 2 beginning at approximately 9:00p due to flame failure. Flare 2 resumed operation at approximately 11:12pm. On September 19, Flare 2 experienced two additional…
