Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/10/2026 at 10:37pm; Resumed Operation on 11/10/2026 by 11:49pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/10/2026 at 10:37pm; Resumed Operation on 11/10/2026 by 11:49pm On Tuesday, November 10, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 10:38pm due to flame failure and Flare 3 at approximately 10:37pm due to low flow. Flares 2 and 3 resumed operation…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/11/2026 at 3:35am; Resumed Operation on 11/11/2026 by 5:03am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/11/2026 at 3:35am; Resumed Operation on 11/11/2026 by 5:03am On Wednesday, November 11, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 3:35am due to flame failure from low combustion air flow. Flare 2 resumed operation on November 11, 2026, at approximately 5:03am.…

Read article