Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/10/2026 at 10:37pm; Resumed Operation on 11/10/2026 by 11:49pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/10/2026 at 10:37pm; Resumed Operation on 11/10/2026 by 11:49pm On Tuesday, November 10, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 10:38pm due to flame failure and Flare 3 at approximately 10:37pm due to low flow. Flares 2 and 3 resumed operation…
