Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/26/2026 at 9:24 pm; Resumed Operation on 10/26/2026 by 11:06 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/26/2026 at 9:24 pm; Resumed Operation on 10/26/2026 by 11:06 pm On Monday, October 26, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 9:24pm due to blower failure. The Parnel TOx resumed operation on October 26, 2026, at approximately 11:06pm, Under…

Read article