Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/18/2026 at 4:10am; Resumed Operation on 10/18/2026 by 9:00am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/18/2026 at 4:10am; Resumed Operation on 10/18/2026 by 9:00am On Sunday, October 18, 2026, Chiquita experienced unplanned downtime of Flare 1, Flare 2, and Flare 3 at approximately 4:34am, 4:10am, and 4:11am due to low temperature, flame failure, and high flow, respectively. Chiquita also…

Read article