Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 11:06am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/16/2026 by 11:06am As previously noticed, on Friday, October 16, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 8:45am due to generator swap. The Parnel TOx resumed operation by October 16, 2026, at approximately 11:06am. Under Condition 81 of the Modified…
