Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/24/2026 at 8:31am; Resumed Operation on 9/24/2026 by 9:33am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/24/2026 at 8:31am; Resumed Operation on 9/24/2026 by 9:33am On Thursday, September 24, 2026, Chiquita experienced unplanned downtime of the Zeeco 1 TOx beginning at approximately 8:31 am due to blower failure. The Zeeco 1 TOx resumed operation at approximately 9:33 am. Due to…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/24/2026 at 5:32 am; Resumed Operation on 9/24/2026 by 7:18 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/24/2026 at 5:32 am; Resumed Operation on 9/24/2026 by 7:18 am On Thursday, September 24, 2026, Chiquita experienced unplanned downtime of Flare 2 beginning at approximately 5:32 am due to flame failure. Flare 2 resumed operation at approximately 7:18 am. Due to this downtime,…

Read article