Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am On Saturday, August 29, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 9:26am due to a blower fault. The Parnel TOx resumed operation on August 29, 2026, at approximately 9:57am. The downtime…
