Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 9:26am; Resumed Operation on 8/29/2026 by 9:57am On Saturday, August 29, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 9:26am due to a blower fault. The Parnel TOx resumed operation on August 29, 2026, at approximately 9:57am. The downtime…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 10:48pm; Resumed Operation on 8/29/2026 by 11:35pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/29/2026 at 10:48pm; Resumed Operation on 8/29/2026 by 11:35pm On Saturday, August 29, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 10:48pm due to flame failure. Flare 3 resumed operation on August 29, 2026, at approximately 11:35pm. The downtime of Flare 3…