Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/25/2026 at 2:00pm; Resumed Operation on 8/25/2026 by 3:46pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/25/2026 at 2:00pm; Resumed Operation on 8/25/2026 by 3:46pm On Tuesday, August 25, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 2:00pm due to flame failure. The Parnel TOx resumed operation on August 25, 2026, at approximately 3:46pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/25/2026 at 10:28am; Resumed Operation on 8/25/2026 by 12:12pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/25/2026 at 10:28am; Resumed Operation on 8/25/2026 by 12:12pm On Tuesday, August 25, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 10:28am due to flame failure. The Parnel TOx resumed operation on August 25, 2026, at approximately 12:12pm. The downtime of…

Read article