Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm On Friday, July 17, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 7:10 pm due to block valve malfunction. Flare 3 resumed operation at approximately 10:01 pm. The downtime of Flare…
