Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 10:25 am; Resumed Operation on 7/18/2026 by 3:08 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 10:25 am; Resumed Operation on 7/18/2026 by 3:08 pm On Saturday, July 18, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 10:25 am due to block valve malfunction. Flare 3 was restarted at 12:51 pm, but then experienced another downtime…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/18/2026 at 11:47 am; Resumed Operation on 7/18/2026 by 2:41 pm On Saturday, July 18, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:47 am due to flame failure. The Parnel TOx resumed operation at approximately 2:41 pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 7:10 pm; Resumed Operation on 7/17/2026 by 10:01 pm On Friday, July 17, 2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 7:10 pm due to block valve malfunction. Flare 3 resumed operation at approximately 10:01 pm. The downtime of Flare…

Read article